30-day free pilot · UK LEV contractors

Check your LEV readings before you leave site.

Record readings, check them against the commissioning benchmark and produce a test readings summary for your TExT record while you're still at the customer.

No credit card • Use on real jobs • Help shape the product

Tolerance check · example

TP-01

Benchmark 10 m/s ±10%

10.5 m/s

WITHIN TOLERANCE

TP-02

Benchmark 50 m/s ±10%

41.2 m/s

OUTSIDE TOLERANCE

The tolerance range is the benchmark ± tolerance. A reading outside it gets a remedial note. The examiner judges control effectiveness.

From the first reading to the next examination

One record per system, from set-up through to the report and the retest date.

  1. 01

    Set up the system

    Add the client, site and LEV system, then its test points with benchmark and tolerance.

  2. 02

    Record readings

    Enter each reading point by point as you test.

  3. 03

    Check readings against tolerance

    Every reading is checked against its benchmark and tolerance, and anything outside it gets a remedial note. The examiner records their own assessment of control effectiveness.

  4. 04

    Generate the readings summary

    Produce a numbered test readings summary as a PDF, supporting your TExT record, before you leave the customer.

  5. 05

    Track the next examination

    The examiner sets the next examination date, up to the 14-month maximum, and TextLev emails reminders as it approaches. Remedial retests are tracked separately.

The readings summary

This is the layout of the test readings summary TextLev generates for each examination: system details, readings against benchmark and tolerance, remedial actions and the next due date. It supports your TExT record and does not replace the examiner's full report.

Test Readings Summary

Supporting the thorough examination and test (TExT) record — COSHH Regulation 9 / HSG258

Example LEV Services Ltd  |  Report No. TX-20261008-A1B2C3D4  |  Issued 8 October 2026


1. System Identification

Client:
Example Manufacturing Ltd
Site:
Northfield Works, Unit 4, AB1 2CD
LEV System:
Welding Bay Extraction
System Reference:
LEV-001
Location:
Fabrication hall
System Type:
Fume extraction

2. Test Details

Test Date:
8 October 2026
Next Examination Due:
8 December 2027
Examiner:
Alex Example
Readings Result:
Readings outside tolerance
Control Effectiveness:
Control not effective (examiner's assessment)
Remedial Action:
Required, follow up by 22 October 2026

3. Test Point Readings

Test PointBenchmarkToleranceReadingCheck
TP-0110 m/s±10%10.5 m/sWITHIN
TP-0250 m/s±10%41.2 m/sOUTSIDE
TP-038 m/s±10%8.1 m/sWITHIN

4. Remedial Actions Required

TP-02: Filter loading. Clean or replace filter, then re-test.

TextLev — Test readings summary TX-20261008-A1B2C3D4Page 1 of 1

Sample readings summary. Company names, readings and report number are examples, not real data.

Who it's for

UK LEV testing contractors and the P601-qualified engineers who work for them. If you are examining extraction systems under COSHH Regulation 9 and still assembling reports from spreadsheets, photos and a template document afterwards, TextLev handles the readings part of that work.

Built for small and mid-sized testing companies — an admin sets up the organisation and invites engineers, and everyone works from the same client, site and system records.

What it does

Record readings on site

Capture readings against the commissioning benchmark for every test point. Each reading is checked against its tolerance, with remedial notes where it matters.

Readings summary as a PDF

Generate a test readings summary supporting the TExT record: system identification, test details, readings against benchmark and tolerance, and remedial notes. It does not replace the examiner's full TExT report.

Next examination reminders

The examiner sets the next examination date: 14 months by default, or a shorter interval where the process needs it. Reminders go out to your engineers at 30, 7 and 1 days before a system falls due, and once more if it goes overdue. Remedial follow-ups are tracked separately from the routine date.

Separated by organisation

Every client, site, system and record is scoped to your company at the database level, so your data is never visible to another contractor on the platform.

30-day free pilot

Try TextLev on your next job

We're opening TextLev to a small group of UK LEV contractors. Use it on real examinations alongside your current process, produce readings summaries and tell us what works, what doesn't and what would save you more time.

30 days free. No contract. No credit card. No obligation.

During the pilot, use TextLev alongside your existing examination reports and scheduling. It records and checks readings and produces a readings summary; keep your current TExT report and retest process as the record.